Why Regional · Why Now

The grid is
tightening.

Demand is arriving faster than metro capacity can absorb. Regional connectivity is the moat.

01
Coal Exit

Volatility is the Product

Every coal unit that closes widens the price spread our batteries are built to capture.

02
Connection Moat

The Queue is the Barrier

Grid connections in the NEM take years to secure. Every approved INTREC Energy site is a position a competitor can't replicate. Our pipeline is the moat.

03
EV Demand

Electric Vehicle and Truck Surge

CSIRO expect regional demand for ultra fast charging plugs to exceed 5,000 by 2035. The current number in regional Australia is close to 0.

04
Compute Demand

AI Needs Regional Power

Our energy hubs turn grid constraint into our third revenue layer.

Forecast · 2026 → 2046

Australia's forecast electricity demand from data centres, electric vehicles and trucks

010203020262030203420382042204631 TWh27 TWh21 TWh
Data centres
31 TWh
Passenger EVs
27 TWh
Electric trucks & freight
21 TWh

Combined demand grows ~13× — from ~6 TWh (2026) to ~79 TWh (2046). Sources: AEMO 2026 ISP; Oxford Economics Australia data centre forecast.