01
Coal Exit
Volatility is the Product
Every coal unit that closes widens the price spread our batteries are built to capture.

Demand is arriving faster than metro capacity can absorb. Regional connectivity is the moat.
Every coal unit that closes widens the price spread our batteries are built to capture.
Grid connections in the NEM take years to secure. Every approved INTREC Energy site is a position a competitor can't replicate. Our pipeline is the moat.
CSIRO expect regional demand for ultra fast charging plugs to exceed 5,000 by 2035. The current number in regional Australia is close to 0.
Our energy hubs turn grid constraint into our third revenue layer.
Combined demand grows ~13× — from ~6 TWh (2026) to ~79 TWh (2046). Sources: AEMO 2026 ISP; Oxford Economics Australia data centre forecast.