Aerial view at dusk of a battery energy storage construction site: rows of BESS containers, cranes, work lights, and a substation in regional Australia.
Roadmap

Built in Waves.
100MW Dispatchable by Month 36.
The Next Wave.

A staged buildout across NSW and SA — foundation sites first, then network-scale expansion — delivered against a hard 36-month horizon.

Delivery Waves
WAVE 1 MONTHS 1-6
Foundation Sites Secured

First hubs acquired in NSW and SA. Connections secured.

WAVE 2 MONTHS 7-12
Portfolio Velocity

One new site acquired every month. Equipment slots locked with HV equipment manufacturers.

WAVE 3 MONTH 18
Revenue Begins

The first two hubs energise and begin trading. Eight hubs operational by month 24.

WAVE 4 MONTH 36
The Next Wave

100MW operational across four NEM regions. Expansion pipeline, same playbook, proven at portfolio scale.

RoadmapVideo
Open video ↗
Foundation Portfolio
BATHURST, NSW
1.5MW
PORT WAKEFIELD, SA
2MW
PORT AUGUSTA, SA
3MW
WHYALLA, SA
5MW