High-voltage, energy-dense regional platforms — battery storage, edge data centres, and ultra-fast charging — stacked on one site.
Energy arbitrage, FCAS and grid services from grid-forming LFP batteries.
Foundation layer — positive NPV at an 8% hurdle on its own. Escalating with NEM volatility as coal exits the market.
Reserved capacity leased to charge-point operators plus energy throughput margins as utilisation ramps.
Leasing guaranteed dispatchable capacity from INTREC Energy solves the operator's three major power supply problems.
AI inference and HPC workloads where grid-constrained operators can't build.
We provide firm dispatchable power and a highly competitive energy throughput structure.